| After
service I. Please read the instructions carefully
before use and installation.
II. The points for attention during test.
⒈ The ambient temperature: 20±2℃ at standard atmosphere
if the testing equipment is of bell type. The different
between room temperature and temperature of fluid in
the bell should be less than 1℃.
⒉ Test requirements:
① Keep the gas meters in the required ambient conditions
for 2 hours.
② Before test 100 litre of air should be passed through
in order to regulate the measurement error caused by
transportation.
③ The number of serially tested meters should not be
more than 3 units. If it is more than 3 units, the corresponding
data correction should be carried out.(The correction
coefficient is related meters. There is no a unified
given value. It is obtained from analysis of several
comparative measurement.)
④ Before testing, first of all check the leak in testing
system after the meters are installed, turn on the air
valve, close the outlet of the last meter, and observe
for 3 minutes to see whether the system has leak of
not. If there's any leak check the equipment and tools
until there's no leak.
III. The points for attention on installation
⒈ Leak check (when the water column in U-tube goes down)
① The valve before meter is not turned off. So the meter
is overpressurized. Check the meter for leak weth water
and replace it.
② There is leak in connections, because the connection
is not tightened or its fasket is damaged or not properly
installed. Install again or replace the gasket.
③ If the meter itself has got a leak, check it with
soap water
④ If the installation temperature is less than the ambient
timpenture it carses the water column in T-tube to go
down and loses presure
IV. For more information or service please do not hesitate
to contact us.
Tel: 0086-022-26023396
0086-022-26320163
|